Workflow Rules provide a simple way to enhance, customize, and automate your workflow.
Use Workflow Rules to…
- Send automatic email notifications.
- Tell the system when to move a document from one phase to another.
- Download completed translations to your corporate website.
- Automatically lock TM for initial workflow phases…and more.
Just choose the condition that needs to be met (e.g. translation is complete) and the automatic action to take (e.g. send an email notification to the project manager).
Once the rule is saved, it will run automatically as part of the workflow.
To add a rule,
-
Open a workflow.
Select Project Resources from the sidebar, open Workflows, select the desired workflow.
-
Select a phase.
Click on the phase where you wish to add a rule.
- Select Configuration
This will open the workflow configuration screen.-
Add the rule.
Scroll down to the Rules section and click the + Add Rule icon. -
Create the rule.
Using the drop-down menus, create as many rules as you wish.
Scroll to select the desired condition(s) and automatic action(s).You can set multiple conditions for a single rule by using the + sign.
-
Add the rule.
- Save your work.
A list of sample scenarios, along with available conditions and automatic actions will follow.
Sample Scenarios
Workflow rules provide a powerful way to automate tasks and save time.
For example….
-
Scenario: You want project managers to receive notification when translations are complete.
Add this Rule: When the translation is complete, send an email notification to the assigned project manager.
You might want to add several actions to a single rule.
-
Rule: When the translation is complete, send an email notification to the assigned project manager
– and –
Download the completed translations to my corporate website.
When creating a rule, you can choose from up to 10 available actions for any of 5 conditions.
Mix and match these conditions and actions to automate notifications, downloads, and more.
Please see below for a description of each condition and its available actions.
You may set as many (or as few) rules as you wish.
Conditions
Choose…
|
To kick off an action when… |
Phase Starts |
The workflow moves from the previous phase to the current phase |
Phase Progress % Reaches |
The phase reaches a certain percentage of completion |
Phase is Marked Complete |
The linguist manually marks the current phase as complete. (e.g. the Reviewer marks the review as complete). |
Machine Translation Process Completes |
The automatic machine translation finishes running. |
Leverage Translation Memory Process Completes |
The automatic TM leverage finishes running. |
Available Automatic Actions
Action |
Description |
Mark phase complete |
Allows the linguist to manually mark the current phase as complete. |
Start next phase |
Starts the next phase in the workflow. (e.g. when the translation is complete, it can trigger the review phase) By default, each workflow has rules that can move a document from one phase to another; you may edit these rules or add new ones as needed. |
Copy translations from previous phase |
Copies all of a document’s translations from one workflow phase to another (e.g. copy all translations from the Human Translate phase to the Human Review phase). Check “Overwrite any existing translations in this phase” to update existing translations with the copied translations. By default this is unchecked, and only copies over translations for the segments not yet saved/approved by the linguist. |
Leverage translation memories |
Applies updated translation memory to the existing project. You can choose which TM vaults to use, and which vaults take precedence. This is typically run at the beginning of a project; however, a TM leverage can be added to any phase of the workflow. |
Machine translate |
Runs the machine translate phase using the engine(s) of your choice. Use the dialog to choose which MT Engine to use. Note – By default, only untranslated segments will be machine translated. |
Auto format segments |
Automatically applies format tags to all segments. Note: We recommend human review for all automatically applied format tags. It could make sense to run this step immediately after starting the translate phase. That way the linguist can evaluate automatic tags to ensure they are applied properly. |
Propagate locked segments |
TM locks do not automatically carry over from one phase to another (allowing the flexibility for human correction of TM in later phases). This rule will always be honored, even if the phase is skipped or cancelled When you add a rule to propagate locked TM segments to additional phases, it will lock the TM for all of the phases of your choice. |
Generate quote |
|
Send an email notification |
When the document reaches the condition you specify, send an email notification to the type of user you specify and customize the email message. You can set the notification by role (e.g. current assignee, next assignee, etc.) or you can send the notification to a specific email address. Each message is fully customizable, complete with automatic variables that can be used to draw in information about the document (e.g. {DocumentName}). |
Send an HTTP notification |
This feature is available in API 4 Configures an HTTP notification to allow 3rd Party Systems communicate with the Lingotek system. Most often, this feature is used to notify your CMS that Lingotek content is ready for download. It includes metadata such as the phase name. Enter the pre-authenticated URL you want to use for your CMS. This step is usually performed when the project is completely finished. This can be configured via your Lingotek/CMS integration. |
Call project callback URL |
This feature is available in API 5 Similar to “Send an HTTP Notification,” this allows the Translation Management System communicate with 3rd Party Systems in a newer, faster process. You can use this feature to notify your CMS (Drupal, WordPress, Ektron) that Lingotek content is ready for download onto your site. If an automatic download feature is set up within the integration, all completed files can be automatically downloaded to your company website’s corporate content management system. This step is usually performed when the project is completely finished. This can be configured on the project level (under Project Settings). |
Mark phase as invoiceable |
|
Mark all previous billable phases as invoiceable |
|
Mark all billable phases as invoiceable |
|
Send quality evaluation results |
|
Comments
0 comments
Please sign in to leave a comment.